margaritaville panama city
i'm heading down to my house in p.c. early march and noticed that's near the time m'ville is supposed to open...anyone have any word on when exactly it's supposed to open up?
Now and then we had a hope that if we lived and were good, God would permit us to be pirates.
- Life on the Mississippi
- Life on the Mississippi
-
UpstateNYPH
- Behind Door #3
- Posts: 3102
- Joined: January 5, 2005 6:46 pm
- Number of Concerts: 0
- Location: Used to be NY, but now NJ
-
gingerbreadman
- On a Salty Piece of Land
- Posts: 10698
- Joined: September 26, 2003 12:47 am
- Number of Concerts: 0
- Location: North Carolina
-
catsway
- I Love the Now!
- Posts: 1606
- Joined: January 22, 2008 7:47 am
- Favorite Buffett Song: Quietly Making Noise
- Number of Concerts: 7
- Favorite Boat Drink: The one in my Hand
- Location: Miramar Beach (The Crazy Beach)
Panama City Margaritaville Update
I am driving over to Pier Park today and see if I can get some info from the Project Manager on the exact opening date. Last time we spoke (two weeks ago), it is supposed to open March 5th. But we've had alot of rain and bad weather the past week so this could slow things a bit. If I speak with him today, I'll update this afternoon.
-
Communicado
- Southeast of disorder
- Posts: 78
- Joined: April 6, 2005 10:15 am
- Number of Concerts: 0
- Location: Rome, GA
-
catsway
- I Love the Now!
- Posts: 1606
- Joined: January 22, 2008 7:47 am
- Favorite Buffett Song: Quietly Making Noise
- Number of Concerts: 7
- Favorite Boat Drink: The one in my Hand
- Location: Miramar Beach (The Crazy Beach)
Back from Margaritaville
Okay, I made the trip over and back. I parked behind the new Ron Jons's located at Pier Park. I walked through the shop and it smells so new with all the wood they used on the floors. Almost bought a t-shirt, but I'll wait till next week when M'ville opens. I walked on up the sidewalk to the deck in front. They have made a lot of progress since last week. The deck looks pretty finished. They were acid washing the concrete floor inside so I wasn't able to go in. They have placed yellow caution tape all the way around the front. Everyone looked very busy putting bar and kitchen equipment inside. The cabinet makers were doing a lot of sawing outside. The landscappers were putting plants in the ground.I wasn't able to speak to anyone this time so I am going by the info that I got last week, March 5th is the opening. I believe they have made enough progress with the building, but I wonder when the employees will arrive for training and stocking. We'll find out soon....